Building
Step 1
Project and device profiles
Enter project-wide choices once. Third-party current values are editable defaults.
Review third-party maximum-current profiles
Use the selected manufacturer/model maximum current. These values apply across the project and do not modify the shared catalogue.
Step 2
Buildings, floors and hub rooms
Every floor selects one lead architecture. Hub rooms then follow that floor choice.
Rename the default labels to match the project drawings—for example, Tower A, Level 2 or East Hub Room.
Step 3
Live design review
Hub-room panels, controller utilisation, power status and floor totals.
Step 4
Consolidated site BoQ
Combined project quantities. Pricing is excluded.
| Part number | Product | Quantity |
|---|
Power calculations use maximum current. Actual standby current is normally lower. Loads above a PSU's normal design value are flagged while remaining valid below the confirmed overload threshold.
Local battery count can become substantial. For larger sites, consult the end user or consultant about UPS-backed central power with smaller local backup batteries.